GWD6-Q17: Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
A.Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve B.Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve C.Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving D.There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving E.There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
A.Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve B.Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
A里 between 1876 and 1904修饰 construction B里 这个词组修饰SYSTEM,意思是似乎这个系统只在1876和1904之间有作用