ChaseDream
搜索
12下一页
返回列表 发新帖
00:00:00

Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.

正确答案: A

更多相关帖子

524

帖子

15

好友

4712

积分

ChaseDream

注册时间
2003-03-17
精华
8
解析
查看: 5955|回复: 11
打印 上一主题 下一主题

GWD6-Q17:

[复制链接]
跳转到指定楼层
楼主
发表于 2011-6-1 16:33:55 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
GWD6-Q17:
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.



A.Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve

B.Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve

C.Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving

D.There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving

E.There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving

答案A  请问如果没有明确时间的话,就不能选完成时么?
收藏收藏 收藏收藏
沙发
发表于 2011-6-1 17:06:06 | 只看该作者
过去的一段时间,一般不能用现在完成时;而过去完成时则需要体现出过去的过去这个概念
板凳
发表于 2011-6-1 17:18:07 | 只看该作者
GWD6-Q17:
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.



A.Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve

B.Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve

C.Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving

D.There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving

E.There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving

答案A  请问如果没有明确时间的话,就不能选完成时么?
-- by 会员 nysen (2011/6/1 16:33:55)


完成时一般不能在句子里单独使用,换句话说就是它需要一般现在时或者是一般过去时在一起搭配用。
地板
 楼主| 发表于 2011-6-1 23:08:44 | 只看该作者
多谢楼上两位!~
5#
发表于 2011-6-2 16:25:45 | 只看该作者
完成时有两种情况,一是过去的动作延续到现在,二是过去的动作结束了,但它的影响延续到现在,这道题当中concerns 并没有一只lead到现在,它的影响也并不明显,所以就用过去时,而且有between 1876 and 1904, 算是一个小提示。
6#
发表于 2011-6-2 16:26:29 | 只看该作者
补充一下,刚才说的那个是现在完成时
7#
发表于 2011-6-2 19:50:21 | 只看该作者
这题主要考的不是时态的问题,P.S.没有明确的时间提示可以用现在完成时,但没有明确的逻辑先后顺序不能用过去完成时。
这题主要考的是状语的放置位置between 1876 and 1904 ,首先排除DE用there be啰嗦了,B的between 1876 and 1904 修饰了sewer systems ,逻辑不符,同样的C中 between 1876 and 1904 修饰了led to ,逻辑不符。
只有construction才能历经从1876到1904
8#
发表于 2011-6-2 20:04:37 | 只看该作者
这题主要考的不是时态的问题,P.S.没有明确的时间提示可以用现在完成时,但没有明确的逻辑先后顺序不能用过去完成时。
这题主要考的是状语的放置位置between 1876 and 1904 ,首先排除DE用there be啰嗦了,B的between 1876 and 1904 修饰了sewer systems ,逻辑不符,同样的C中 between 1876 and 1904 修饰了led to ,逻辑不符。
只有construction才能历经从1876到1904
-- by 会员 爱吃巧克力 (2011/6/2 19:50:21)


construction历经从1876到1904 也不就是 construction of three separate sewer systems 历经1876 到1904 吗?
我个人认为 of 和between 。。。and。。 的前后顺序是颠倒的~我觉得B错的重点还是在它用了现在完成时,因为没有hint使用have led,1876 到1904年是个过去的概念,have led 是发生在过去,但与现在有关的概念。而且,现在完成时一般是与一般现在时或一般将来时连用的~基本不单独出现。不知道你们的看法如何?多多指教~
9#
发表于 2011-6-2 20:13:10 | 只看该作者
B中between 1876 and 1904 严格修饰的是 sewer systems ,而不是 construction of three separate sewer systems,时态问题可以挑刺,但此题不可作为判错标准
10#
发表于 2012-4-1 19:30:47 | 只看该作者
修饰真得很重要,又没注意到,哎
您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

IESE MBA
近期活动

正在浏览此版块的会员 ()

手机版|ChaseDream|GMT+8, 2024-12-26 22:36
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部