Concerns about public healthled to the construction between 1876 and 1904 of three separate sewer systemsto serve metropolitan Boston.
窝迷惑得是B, 一个是完成时和过去时, between 过去得一段时间不是应该加完成时得嘛,额,
还有就是这个between 1876 and 1904得位置, 修饰部分应该紧挨着被修饰得部分, 可以着个时间段放在systems 是不是也可以呢,因为construction of 。。。systems 是个整体呢
A. Concerns aboutpublic health led to the construction between 1876 and 1904 of three separatesewer systems to serve
B. Concerns about public health have led to the constructionof three separate sewer systems between 1876 and 1904 to serve
C. Concerns about public health have led between 1876 and1904 to the construction of three separate sewer systems for serving
D. There were concerns about public health leading to theconstruction between 1876 and 1904 of three separate sewer systems serving
E. There were concerns leading between 1876 and 1904 to theconstruction of three separate sewer systems for serving
|