ChaseDream
搜索
返回列表 发新帖
00:00:00

Highway Official: When resurfacing our concrete bridges, we should use electrically conductive concrete (ECC) rather than standard concrete. In the winter, ECC can be heated by passing an electric current through it, thereby preventing ice buildup. The cost of the electricity needed is substantially lower than the cost of the de-icing salt we currently use.Taxpayer: But construction costs for ECC are much higher than for standard concrete, so your proposal is probably not justifiable on economic grounds.

Which of the following, if true, could best be used to support the highway official's proposal in the face of the taxpayer's objection?

正确答案: A

更多相关帖子

524

帖子

15

好友

4712

积分

ChaseDream

注册时间
2003-03-17
精华
8
解析
查看: 1533|回复: 0
打印 上一主题 下一主题

GWD-21 Q3

[复制链接]
楼主
发表于 2009-7-23 16:40:00 | 只看该作者

GWD-21 Q3

Highway Official:  When resurfacing our concrete bridges, we should use electrically conductive concrete (ECC) rather than standard concrete.  In the winter, ECC can be heated by passing an electric current through it, thereby preventing ice buildup.  The cost of the electricity needed is substantially lower than the cost of the deicing salt we currently use.

Taxpayer:  But construction costs for ECC are much higher than for standard concrete, so your proposal is probably not justifiable on economic grounds.

Which of the following, if true, could best be used to support the highway official’s proposal in the face of the taxpayer’s objection?

 

A.      The use of de-icing salt causes corrosion of the reinforcing steel in concrete bridge decks and damage to the concrete itself, thereby considerably shortening the useful life of concrete bridges.

B.      Severe icing conditions can cause power outages and slow down the work of emergency crews trying to get power restored.

C.      In weather conditions conducive to icing, ice generally forms on the concrete surfaces of bridges well before it forms on parts of the roadway that go over solid ground.

D.      Aside from its potential use for de-icing bridges, ECC might also be an effective means of keeping other concrete structures such as parking garages and airport runways ice free.

E.       If ECC were to be used for a bridge surface, the electric current would be turned on only at times at which ice was likely to form.

正确答案是A

请教大家为什么选A taxpayer的反对原因是 ECCconstruction cost比standard concrete 高,A好像不能在这点上支持offical proposal。谢谢!

您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

手机版|ChaseDream|GMT+8, 2024-11-24 16:35
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部