发表于 2005-3-17 06:56:00 | 只看该作者
从 it is unlikely that Swift would have the mechanicalproblems with more than one or two scheduled flights on a single day  以及 a cancellation is due tomechanical problems with the airplane scheduled for a certain flight, 能得出结论Swift每天最多有one or two airplanes死翘翘。

然后,引用dphxmg得出结论.

"
假设,那九个被取消的flights完全由那1或2架由机械故障死翘翘的飞机来承担的话,我们就得不出结论:之所以取消那九次飞行任务不完全是由于机械故障所致。" --dphxmg
12#
发表于 2013-4-16 11:58:44 | 只看该作者
A 反过来说:只有一架或者两架飞机被安排给了那九个航班。
按照原文讲述,S公司一辆架飞机同时出机械故障是有可能的。
那就得出了结论,nine cancellation 都是因为机械故障。
与原文意思相反。


13#
发表于 2013-5-11 08:08:48 | 只看该作者
zcx 发表于 2004-4-11 23:33
23. On a certain day, nine scheduled flights on Swift Airlines were canceled. Ordinarily, a cancella ...

1. 9 scheduled flights cancelled
2. airplane scheduled for flight is canceled-->mechanical problem
3. no more thatn 1 or 2 schduled flight with mechanical problem

assumption: if only 1 or 2 airplanes scheduled for flight  due to mechanic problems were cancelled and led to the 9 flight cannellations (an airplane could have multi-flights), it cannot be the case that there are something else. But if over 2 airplanes airplanes scheduled for flights were cancelled, we are sure that something else happens.

您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

所属分类: 法学院申请

近期活动

正在浏览此版块的会员 ()

手机版|ChaseDream|GMT+8, 2025-1-9 06:34
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部