1。 Assume X needs x days to finish W, and Y needs y days to finish W. Condition (1): x = y+2 Condition (2): (1/x+1/y)* 3 = 5/4 From (1)(2) we can get x = 6 and y = 4. Therefore 2x = 12, Answer (E) 2. x+y + y = 70 3. To round up to the nearest 6 cm, the side length a must be equal or greater than 5.5 cm. Therefore Area >= 5.5*5.5 = 30.25 So (D) is the least possible 4 (E) as discussed above. 4. |