1,A certain quantity is measured on two different scales, the R-scale and the S-scale, that are related linearly. Measurements on the R-scale of 6 and 24 corrsepond to measurements on the S-scale of 30 and 60 respectively.What measurement on the R-scale corresponds to a measurement of 100 on the S-scales?
A,20.B,36.C,48.D,60.E,84
答案是C,一点都不明白这题怎么算的。
2,For each landscaping job that takes more than 4 hours, a certain contractor charges a total of r dollars for the first 4 fours plus 0.2r dollars for each additional hour or fraction of an hour, where r>100. Did a particular landscaping job take more than 10 hours?
(1) the contractor charge a total of $288 for the job.
(2) the contracdtor charge a total of 2.4r dollars for the job.
答案是b,但是我觉得(1)¥288<4*100(根据条件r>100),所以工作时间一定小于10小时,能够回答问题,为什么不选(1)和(2),也就是d答案呢? |