ChaseDream
搜索
返回列表 发新帖
查看: 980|回复: 1
打印 上一主题 下一主题

[求助]请帮忙四道数学题!

[复制链接]
楼主
发表于 2007-10-23 04:54:00 | 只看该作者

[求助]请帮忙四道数学题!

 1. If a and b are integers, is b even?

(1)
                
  3a + 4b is even.

(2)
                
  3a + 5b is even.

我选E,可答案是C,不懂是为什么?

2.

When tossed, a certain coin has equal probability of landing on either side.  If the coin is tossed 3 times, what is the probability that it will land on the same side each time? A.1/8   B. 1/4     C. 1/3   D.3/8    E.1/2

3.

If xyz
                            
0, is x (y + z) ≥ 0?

(1)   y + z│ = │y│ + │z

(2)
                                
  x + y│ = │x│ + │y

4.

What is the median number of employees assigned per project for the projects at Company Z?

(1)   25 percent of the projects at Company Z have 4 or more employees assigned to each project.

(2)   35 percent of the projects at Company Z have 2 or fewer employees assigned to each project.

这题我选E,可答案说是C,为什么?

If xyz
                    
0, is x (y + z) ≥ 0?

(1)   y + z│ = │y│ + │z

(2)
                        
  x + y│ = │x│ + │y

4.

What is the median number of employees assigned per project for the projects at Company Z?

(1)   25 percent of the projects at Company Z have 4 or more employees assigned to each project.

(2)   35 percent of the projects at Company Z have 2 or fewer employees assigned to each project.

这题我选E,可答案说是C,为什么?

When tossed, a certain coin has equal probability of landing on either side.  If the coin is tossed 3 times, what is the probability that it will land on the same side each time? A.1/8   B. 1/4     C. 1/3   D.3/8    E.1/2

3.

If xyz
                
0, is x (y + z) ≥ 0?

(1)   y + z│ = │y│ + │z

(2)
                    
  x + y│ = │x│ + │y

4.

What is the median number of employees assigned per project for the projects at Company Z?

(1)   25 percent of the projects at Company Z have 4 or more employees assigned to each project.

(2)   35 percent of the projects at Company Z have 2 or fewer employees assigned to each project.

这题我选E,可答案说是C,为什么?

If xyz
        
0, is x (y + z) ≥ 0?

(1)   y + z│ = │y│ + │z

(2)
            
  x + y│ = │x│ + │y

4.

What is the median number of employees assigned per project for the projects at Company Z?

(1)   25 percent of the projects at Company Z have 4 or more employees assigned to each project.

(2)   35 percent of the projects at Company Z have 2 or fewer employees assigned to each project.

这题我选E,可答案说是C,为什么?

沙发
发表于 2007-10-23 11:40:00 | 只看该作者

一起来讨论吧。我的思路如下:

1。选C 因为(1)只能推出a是偶数,(2)a和b都不能确定

  (1)+(2)连个条件和起来,可推出(3a+5b)-(3a+4b)=b 偶数-偶数,当然还是偶数

2。连续三次都是一个面,有两种可能,正或反,每种概率都是1/8,所以答案是1/4,选B

3。条件(1)可推出y和z同号,(2)可推出x和y同号,(1)+(2)可推出x,y,z同号,x和y+z同号,积必然大于0

4。(1)说25%的工程要4个或4个人以上去做 (2)说35%的工程要2个或少于2个人去做

    (1)+(2)可推出,40%的工程需要3个人去做。一个工程按100%算的话,median number 在那个50%的位置。所以,选C

有不对的地方,欢迎指出来,谢谢:)

您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

手机版|ChaseDream|GMT+8, 2024-11-9 10:41
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部