1. If x is a positive number less than 10, is z greater than the average (arithmetic mean) of x and 10 ? (1) On the number line, z is closer to 10 than it is to x. (2) z = 5x Answer:A 2. A contractor combined x tons of a gravel mixture that contained 10 percent gravel G, by weight, with y tons of a mixture that contained 2 percent gravel G, by weight, to produce z tons of a mixture that was 5 percent gravel G, by weight. What is the value of x ?
(1) y = 10 (2) z = 16 Answer: D 3. Machines X and Y work at their respective constant rates. How many more hours does it take machine Y, working alone, to fill a production order of a certain size than it takes machine X, working alone?
(1) Machines X and Y, working together, fill a production order of this size in two-thirds the time that machine X, working alone, does. (2) Machine Y, working alone, fills a production order of this size in twice the time that machine X, working alone, does. Answer: E 这几道我已经在prep汇总的帖子里面搜索了,但是没有搜索到啊?请各位NN们给解释一下,或者你们找到的以前解释的link,谢啦