GWD-8-Q16: GWD-13-15 Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston. A. Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve B. Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve C. Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving D. There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving E. There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
OA是A,我选的是B。我的选择原因: 1.我记得在哪里看到过,如果是一个很长时间跨度(比如这里的 between 1876 and 1904 ),那么可以用完成时。还有,完成时不是对现在有影响的吗?这个construction必然对现在有影响啊…… 2.如果是A的话,那么说明three separate sewer systems是一个construction下面同时建造的。而B选项则突出three separate sewer systems是在 between 1876 and 1904 这个大的时间段里分别建造起来的。我觉得后面一种解释更加符合实际。
请nn帮忙解释一下时态问题和后面的 between 1876 and 1904 出现地方的问题。谢谢
[此贴子已经被作者于2009/10/29 9:43:21编辑过] |