ChaseDream
搜索
返回列表 发新帖
查看: 809|回复: 2
打印 上一主题 下一主题

借宝地问个困扰我很久的关于时态的SC 题目

[复制链接]
楼主
发表于 2009-10-29 09:34:00 | 只看该作者

借宝地问个困扰我很久的关于时态的SC 题目

GWD-8-Q16: GWD-13-15

Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.

A.      Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve

B.      Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve

C.      Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving

D.      There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving

E.       There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving


OA是A,我选的是B。我的选择原因:

1.我记得在哪里看到过,如果是一个很长时间跨度(比如这里的 between 1876 and 1904 ),那么可以用完成时。还有,完成时不是对现在有影响的吗?这个construction必然对现在有影响啊……

2.如果是A的话,那么说明three separate sewer systems是一个construction下面同时建造的。而B选项则突出three separate sewer systems是在 between 1876 and 1904 这个大的时间段里分别建造起来的。我觉得后面一种解释更加符合实际。


请nn帮忙解释一下时态问题和后面的 between 1876 and 1904 出现地方的问题。谢谢


[此贴子已经被作者于2009/10/29 9:43:21编辑过]
沙发
发表于 2009-10-29 16:34:00 | 只看该作者

有正常答案吗?我选B

个人觉得表示目的的话用不定式比for doing 更好。另外大段时间应该用完成式。

不过不确认.

板凳
发表于 2009-10-29 17:30:00 | 只看该作者
我觉得是A啊,这里动词lead to用什么时态跟宾语没有关系呀,between 1876 and 1904是用来限制宾语construction的,所以是出题人故意迷惑考生的。

您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

手机版|ChaseDream|GMT+8, 2025-5-6 11:33
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2025 ChaseDream.com. All Rights Reserved.

返回顶部