ChaseDream
搜索
返回列表 发新帖
查看: 982|回复: 2
打印 上一主题 下一主题

[求助] 两道 DS 题

[复制链接]
楼主
发表于 2008-9-19 23:49:00 | 显示全部楼层

[求助] 两道 DS 题

1.       A construction company was paid a total of $500,000 for a construction project. The company’s only costs for the project were for labor and materials. Was the company’s profit for the project greater than $150,000?

(1)    the company’s total cost was three times its cost for materials

(2)    the company’s profit was greater than its cost for labor

这种文字转换题是我的弱项,
        
答案选择C
        
烦请大家给我解释一下,谢谢

 

2.       A contractor combined X tons of a gravel mixture that contains 10 percent gravel G, by weight, with Y tons of a mixture that contains 2 percent gravel G, by weight, to produce Z tons of a mixture that was 5 percent gravel G, by weight. What is the value of X?

(1)    Y=10

(2)    Z=16

答案选择D
        
我列了一个等式,应该是必须Y,Z两个量知道了才行,不知道为什么是D。谢谢大家的解释

 

沙发
 楼主| 发表于 2008-9-20 15:10:00 | 显示全部楼层

yunlinli,thank you very much, your explanation is very clear.

第二题我自己根据最终混合物的combination情况列了一个有关X,Y,Z的等式,因为没有Y和Z之间的关系,所以答案最后选择D, 我实在不能理解。

大牛们,烦请解释一下吧

板凳
 楼主| 发表于 2008-9-20 17:45:00 | 显示全部楼层

知道的大牛们解释一下吧,谢谢

 

您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

手机版|ChaseDream|GMT+8, 2025-6-30 11:07
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2025 ChaseDream.com. All Rights Reserved.

返回顶部