ChaseDream
搜索
返回列表 发新帖
00:00:00

In a plan to stop the erosion of East Coast beaches, the Army Corps of Engineers proposed building parallel to shore a breakwater of rocks that would rise six feet above the waterline and act as a buffer, so that it absorbs the energy of crashing waves and protecting the beaches.

正确答案: C

更多相关帖子

524

帖子

15

好友

4712

积分

ChaseDream

注册时间
2003-03-17
精华
8
解析
查看: 1773|回复: 1
打印 上一主题 下一主题

[求助]sec14-04,大全362

[复制链接]
楼主
发表于 2006-4-17 15:15:00 | 只看该作者

[求助]sec14-04,大全362


1.        In a plan to stop the erosion of East Coast beaches, the Army Corps of Engineers proposed building parallel to shore a breakwater of rocks that would rise six feet above the waterline and act as a buffer, so that it absorbs the energy of crashing waves and protecting the beaches.


(A) act as a buffer, so that it absorbs


(B) act like a buffer so as to absorb


(C) act as a buffer, absorbing


(D) acting as a buffer, absorbing(C)


(E) acting like a buffer, absorb


362, sec14-04


A) “, so that”多半错; it指代不清,可能是the Army Corps
B) 在这里act as可能比act like更符合习惯; so as toto absorb修饰对象不清。
C) best. absorbing伴随rise and act
D) rise and acting
不平行。
E) 同上。



请教各位A,答案中这样解释可以吗?And what is modified by "absorbing" in choice C? Thanks a lot.

沙发
发表于 2006-4-17 17:09:00 | 只看该作者
propose building parallel
您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

IESE MBA
近期活动

正在浏览此版块的会员 ()

手机版|ChaseDream|GMT+8, 2024-12-25 09:47
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部