以下是引用liaijun_2001在2006-8-18 18:24:00的发言:Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
- Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
- Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
- Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
- There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
- There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
Answer: B 我选B,但答案是A,why? 主要考虑的是between 1876 and 1904 插在the construction of three separate sewer systems 不好 我认为A 在这里边是最好的: B 中的时态用现在完成时本身就是错误的。因为首先1904年都是上个世纪的时间了,怎么能够用完成时?另外,时间修饰成分between 1876 and 1904 放的地方也时有问题,它更近于修饰three separate sewer systems 而不是 construction.给人的理解是 contruction 了 在1876和1904之间的three sewer systems. 错。 A 中时态正确,costruction 是between 1876 and 1904 之间,costruction 的目的用 动词不定式来表示,非常正确。 |