ChaseDream
搜索
返回列表 发新帖
00:00:00

Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.

正确答案: A

更多相关帖子

524

帖子

15

好友

4712

积分

ChaseDream

注册时间
2003-03-17
精华
8
解析
查看: 1555|回复: 2
打印 上一主题 下一主题

求助GWD6-7关于完成时

[复制链接]
楼主
发表于 2006-11-17 03:50:00 | 只看该作者

求助GWD6-7关于完成时

Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.

 

  1. Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve

  2. Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
  3. Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
  4. There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
  5. There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving   between不是表示一个时间段,为什么不选C用完成时呢?
沙发
发表于 2006-11-17 06:25:00 | 只看该作者
between 1876 and 1904的位置不对,意思有变。
板凳
发表于 2007-10-30 22:15:00 | 只看该作者

为什么要用完成式呢?

您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

IESE MBA
近期活动

正在浏览此版块的会员 ()

手机版|ChaseDream|GMT+8, 2024-11-24 10:31
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部