ChaseDream

标题: OG 73 [打印本页]

作者: GRASPDREAM    时间: 2007-8-26 11:21
标题: OG 73

73. “Fast cycle time” is a strategy of designing a manufacturing organization to eliminate bottlenecks and delays in production. Not only does it speed up production, but it also assures quality. The reason is that the bottlenecks and delays cannot be eliminated unless all work is done right the first time.

 

The claim about quality made above rests on a questionable presupposition that

(A) any flaw in work on a product would cause a bottleneck or delay and so would be prevented from occurring on a “fast cycle” production line

(B) the strategy of “fast cycle time” would require fundamental rethinking of product design

(C) the primary goal of the organization is to produce a product of unexcelled quality, rather than to generate profits for stockholders

(D) “fast cycle time” could be achieved by shaving time off each of the component processes in production cycle A

(E) “fast cycle time” is a concept in business strategy that has not yet been put into practice in a factory

 

 

 

这道题是因果关系形,我通过最后一句话可以推出A来,但是不知道它这最后一句话是想怎么解释FAST CYCLE TIME的,也就是说我不明白它这第一句话给我是干什么用的.......

 

请教中.....................


作者: platobungee    时间: 2007-8-26 14:00
以下是引用GRASPDREAM在2007-8-26 11:21:00的发言:

73. “Fast cycle time” is a strategy of designing a manufacturing organization to eliminate bottlenecks and delays in production. Not only does it speed up production, but it also assures quality. The reason is that the bottlenecks and delays cannot be eliminated unless all work is done right
    the first time.

 

 

 

The claim about quality made above rests on a questionable presupposition that

(A) any flaw in work on a product would cause a bottleneck or delay and so would be prevented from occurring on a “fast cycle” production line

 

这道题不是因果关系题,是假设题(presupposition = assumption)尽管这个题目中的假设是questionable的(不合理的)

it not only speed up production but also assures quality 是结论,而且重心在assure quality上

题中给出的evidence(论据)是bottlenecks and delays cannot be eliminated unless all work is done right the first time, 这里done right就是指assure quality, 同时注意这里的first time!他的意思是在说只要前面有一次没有done right结果就会存在bottlenecks and delays, 而fast cycle就是用来削除bottlenecks and delays的,也就是说任何一次没有done right都会导致“fast cycle”production line 最终没有完成运作!

所以这个作者在暗地里假设任何一个flaw都将导致bottlenecks and delays (确实questionable), 所以又将导致fast cycle production line不能运作起来,这个假设即是A

 

BTW: MM 的签名图片是《野猪大改造》里的场景吧?


[此贴子已经被作者于2007-8-26 14:02:27编辑过]





欢迎光临 ChaseDream (https://forum.chasedream.com/) Powered by Discuz! X3.3