ChaseDream
标题: GWD-13-Q15 [打印本页]
作者: cll0503 时间: 2006-11-19 15:12
标题: GWD-13-Q15
Q15:
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
- Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
- Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
- Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
- There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
- There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
我选了B,可是答案是A。这是一个事件对后来的影响,为什么不用完成时态?还有between 1876 and 1904为什么放在of three separate sewer systems 前面?哪位大侠能解答?万分感谢!
作者: lennonzeng 时间: 2008-10-22 01:19
顶一下,我也选B了,郁闷,谁来解答下??
作者: balance714 时间: 2010-9-24 22:53
顶一下。。我也选B
欢迎光临 ChaseDream (https://forum.chasedream.com/) |
Powered by Discuz! X3.3 |