ChaseDream
标题: 求助GWD6-7关于完成时 [打印本页]
作者: Tiffany1003 时间: 2006-11-17 03:50
标题: 求助GWD6-7关于完成时
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
- Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
- Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
- Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
- There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
- There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving between不是表示一个时间段,为什么不选C用完成时呢?
作者: jinyiming 时间: 2006-11-17 06:25
between 1876 and 1904的位置不对,意思有变。
作者: daniel_lew 时间: 2007-10-30 22:15
为什么要用完成式呢?
欢迎光临 ChaseDream (https://forum.chasedream.com/) |
Powered by Discuz! X3.3 |