ChaseDream
标题: GWD5-17 [打印本页]
作者: liaijun_2001 时间: 2006-8-18 18:24
标题: GWD5-17
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
- Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
- Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
- Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
- There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
- There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
Answer: B
我选B,但答案是A,why?
主要考虑的是between 1876 and 1904 插在the construction of three separate sewer systems 不好
作者: VicSi 时间: 2006-8-19 17:37
没有明显理由可以改变原句的时态,我是这么想的
作者: redhot99 时间: 2006-10-2 19:21
我觉得B好呀,时态两个都对,但是语序A就有问题
作者: MaccMichAA 时间: 2006-10-17 18:06
以下是引用VicSi在2006-8-19 17:37:00的发言:
没有明显理由可以改变原句的时态,我是这么想的
我觉得也是 么有明显的时间提示词
但是关于construction的修饰成分位置的问题呢?
作者: kevin_chee20 时间: 2006-10-17 18:59
以下是引用liaijun_2001在2006-8-18 18:24:00的发言:Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
- Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
- Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
- Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
- There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
- There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
Answer: B
我选B,但答案是A,why?
主要考虑的是between 1876 and 1904 插在the construction of three separate sewer systems 不好
我认为A 在这里边是最好的:
B 中的时态用现在完成时本身就是错误的。因为首先1904年都是上个世纪的时间了,怎么能够用完成时?另外,时间修饰成分between 1876 and 1904 放的地方也时有问题,它更近于修饰three separate sewer systems 而不是 construction.给人的理解是 contruction 了 在1876和1904之间的three sewer systems. 错。
A 中时态正确,costruction 是between 1876 and 1904 之间,costruction 的目的用 动词不定式来表示,非常正确。
作者: yinhang_1217 时间: 2009-9-6 17:40
我的理解是:Between 1876 and 1904是修饰construction的,应该尽量接近所修饰的名词。
我也初选了B,理由是把between 1876 and 1904当成一段时间所以用了现在完成时。我觉得如果这里用的是construct,没有led什么事儿,那么就应该是现在完成时了。不知道理解的准确不?
作者: zhongtiangg 时间: 2009-9-6 18:36
以下是引用kevin_chee20在2006/10/17 18:59:00的发言:我认为A 在这里边是最好的:
B 中的时态用现在完成时本身就是错误的。因为首先1904年都是上个世纪的时间了,怎么能够用完成时?另外,时间修饰成分between 1876 and 1904 放的地方也时有问题,它更近于修饰three separate sewer systems 而不是 construction.给人的理解是 contruction 了 在1876和1904之间的three sewer systems. 错。
A 中时态正确,costruction 是between 1876 and 1904 之间,costruction 的目的用 动词不定式来表示,非常正确。
强烈支持。
时态优先原则。
GMAT的的答案不是正确的答案,而是相对来说最好的答案。
相比较而言,A比B好。
欢迎光临 ChaseDream (https://forum.chasedream.com/) |
Powered by Discuz! X3.3 |