Let's get together and share all the info.
 楼主| 发表于 2013-1-25 20:35:42 | 显示全部楼层
All of the following must be considered in the process of demand management EXCEPT :
A. Validating engineering specification. B. Tracking demand pattern for each product group.
C. Analyzing complementary product. D. Investigating voice of the customer.

Which one is the correct answer?
 楼主| 发表于 2013-1-28 20:32:46 | 显示全部楼层
Infinite loading is:
A. Level loading without available capacity.
B. Methods for evaluating MPS.
C. Able to investigate queue lengths for a specific workcenter.
D. Capable of representing overloading workcenter.

Which one is the correct answer?
 楼主| 发表于 2013-1-29 20:47:48 | 显示全部楼层
In master scheduling, hedging refers to a practice which:

I. provides a safety lead time
II. Provides safety inventory in case option mixes are different from forecast
III. Gives safety capacity to protect against workcenter overload
IV. Provides safety inventory in case volume is greater than forecast

A. III only
B. I and III only
C. II and IV only
D. I, II and IV only

Which one is the correct answer?
发表于 2013-1-30 11:42:46 | 显示全部楼层
can you share some materials?? I want to take this test n have no idea how to start...
 楼主| 发表于 2013-1-30 20:45:17 | 显示全部楼层
The forecasting system that uses the one forecasting model that would have performed BEST in the
recent past to generate the next forecast is
A. Pyramid forecasting.     B. Focus forecasting.
C. Exponential smoothing. D. Double exponential smoothing.

Which one is the correct answer?
 楼主| 发表于 2013-1-31 21:08:33 | 显示全部楼层
Which of the following elements affect on the change of the bill of resources ?
Ⅰ. Product mix.
Ⅱ. Production technology.
Ⅲ. Product volume.
Ⅳ. Product costing.

A. Ⅰ, Ⅱ B. Ⅱ, Ⅲ C. Ⅲ, Ⅳ D. Ⅰ, Ⅳ

Which one is the correct answer?
 楼主| 发表于 2013-2-1 20:30:26 | 显示全部楼层
Which of the following factors will affect on realistic MPS EXCEPT ?
A. Utilization of modular bills. B. Calculation of the rated capacity per each end item.
C. Accuracy of ATP.              D. Accuracy of bill of resource.

Which one is the correct answer?
 楼主| 发表于 2013-2-4 22:26:44 | 显示全部楼层
BSCM Sample TEST

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?立即注册

x
 楼主| 发表于 2013-2-5 21:18:37 | 显示全部楼层
How many planning bills are required in assemble-to-order manufacturing environment ?
? No of product model = 5.
? No of options for product model = 5.

A. 5 B. 10 C. 25 D. 120

Which one is the correct answer?
您需要登录后才可以回帖 登录 | 立即注册

Mark一下! 看一下! 顶楼主! 感谢分享! 快速回复:

手机版|ChaseDream|GMT+8, 2024-3-28 20:06
京公网安备11010202008513号 京ICP证101109号 京ICP备12012021号

ChaseDream 论坛

© 2003-2023 ChaseDream.com. All Rights Reserved.

返回顶部